We have completed the installation of a 220 kWp photovoltaic system in Arad, intended to power a production unit specialized in individual and industrial plastic purification systems.
The implemented solution includes:
- 490 Jinko 450 Wp photovoltaic panels, with high efficiency and increased durability
- 2 Huawei 100 kW inverters, ensuring the efficient conversion of solar energy into usable electricity
The system contributes to optimizing energy consumption and reducing operational costs, while providing a sustainable alternative for industrial activity.
This project reflects the clear direction towards energy efficiency and environmental responsibility, directly integrated into production processes.