Industrial photovoltaic project completed in Arad – 350 kWp of clean energy!
We are proud to present one of the latest photovoltaic installations for the industrial sector: a 350 kWp system, fully operational, which ensures constant production of green energy and significantly reduces electricity costs.
– Installed power: 350 kWp
– Brands used: Canadian Solar, Huawei, K2 Systems
– Location: Arad
– CO₂ emission reduction ~97–122 t/year
Investing in solar energy is not only an economic decision, but also one of environmental responsibility.